Here are some of the projects we have been involved with in recent years.

LED Advertising Screens, 2014-15

During the second part of 2014 Paneltech were commissioned by Tri Wonder Digital to manufacture 40 large format LED screens for advertising purposes. These screens are 6m x 3m and are for use throughout London. This project was completed in March 2015.

The Artworks at Elephant & Castle, 2014

In 2014 Paneltech were invited to provide stairs and access walkways to a community business scheme also made from shipping containers at The Artworks, Elephant & Castle in London. Around the shipping container courtyard you'll find street food & drink, local, creative & media businesses, a library and regular fun activities, live performances, an art gallery & market, music and much, much more. For more information visit www.theartworks-uk.com

Housing initiative for the homeless in Brighton, 2013

In December 2013 Paneltech were part of a team who built a new containerised housing initiative for the homeless in Brighton, East Sussex. We worked alongside other agencies to convert shipping containers into homes which will provide housing for 36 people for five years. Paneltech manufactured all the Juliette balconies, other balconies, walkways, stairs and handrails to bring the complex together.

Bitulog Bitumen Storage Facility Libreville Gabon, 2011 - 2012

By now, Paneltech have become old hands at installing fast track storage facilities using the TEC Bitutainer system. Again, we provided the structural steelwork, pump skids and control system and then installed the facility in 8 weeks on site! This project included the first Bitumen Ship to Shore discharge unit Supplied by TEC and designed and manufactured by Paneltech. This is a first in its type with new levels of control and safety when discharging bulk bitumen ships directly into road tankers or Bitutainers. Also installed on site was an above ground Weigh Bridge with containerised control room/office.


Orchidwood Mushrooms Vertical Conveyor Beckley East Sussex, 2011

Paneltech have had a close working relationship with Orchidwood for a number of years and were very happy to work on the alterations to their building to accommodate their new mushroom processing plant. Paneltech provided the design from structural engineers specifications, fabricated the additional structure and provided on site project and engineering management.


Angobetumes Bitumen Storage Facility Malange Angola, 2008 - 2011

This project was 'challenging' to say the least. Originally the brief was to provide two small bitumen storage facilities which after delivery of all equipment to the site became one larger facility. Paneltech provided all structural steel work, pump skids, containerised control room, control system, site mechanical and electrical engineering support and full project management. We had staff in Angola for 4 months over the entire period with the project finally completed in early 2011.

Weatherford SPS Compressor System Almeria Spain, 2008

This was the first project after the introduction of our fabrication facility. The project was to provide a diesel fuel bulk storage facility to feed, what was at the time, the largest air compressor system in the world. Paneltech provided pipework, structural steelwork, pump skids and access equipment for the site, all manufactured in the UK and road hauled to Spain. We manufactured the containerised control room and the containerised fire pump plant room for the storage facility. We also designed and installed the entire control system and provided project management support. This was the second large project we had worked with TEC Projects.

Woqod Bitumen Terminal Mesaieed Qatar, 2005 - 2007

Paneltech worked in collaboration with TEC Projects on this first ever fast track storage facility using 40 Bitutainers, supplied by TEC. Our role was to design, manufacture and install the entire control system for the facility, to design the electrical installation and to provide project management support.

Keenland Race Track Lexington Kentucky, 2003 - 2004

Following the introduction of Polytrack all-weather surfaces to the Keenland horse racing complex, Paneltech designed and installed the production facility on site. This included Project supervision and engineering support. During this period, several other sites were installed with similar equipment throughout the USA.

Gray Nicolls Factory, Robertsbridge East Sussex, 2000 - 2001

Following serious flooding in the village of Robertsbridge, Famous cricket bat maker Gray-Nicolls was forced to up sticks after more than a hundred years and move to Rye. Paneltech provided engineering cover for the removal of the factory in Robertsbridge and reinstatement in Rye and Project managed the move. Once flood defense work was completed in Robertsbridge, Gray-Nicolls moved back to Robertsbridge and Paneltech provided engineering support for the return journey.

TEC Projects Office move, Worthing West Sussex, 2000

Paneltech provided project management and contractor liaison for the refurbishment of the new offices and subsequent move from old to new site.

Lukoil Bottling Plant, Ploiesti Romania, 1999 - 2000

Our brief here was to provide electrical engineering capability both on the tools and in a management capacity. We had engineers on site for around six months and were involved in the final handover of the finished facility.

Purple City Skyline

Paneltech Systems Ltd

"Building lasting relationships with our clients through exceptional quality, teamwork and attention to detail."

Tel: (+44) 01424 870111
Fax: (+44) 01424 871556
Email: enquiries@paneltech-systems.co.uk

Terms and Conditions

Constructionline Paneltech ISO 9001 Paneltech

Social Media

Facebook Logo Twitter Logo Linked In Logo

Website Design by Feathers Web Design